(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    First-ever functional flow test conducted at Garrison Dam spillway [Image 17 of 27]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Two construction or engineering workers wearing U.S. Army Corps of Engineers hard hats and high-visibility safety vests are reviewing documents or blueprints at an outdoor site. One worker is pointing at the papers while the other holds the clipboard or document folder. A large concrete dam or flood control structure is visible in the background.

    David Beck (left), U.S. Army Corps of Engineers, Omaha District, Garrison Dam operations project manager, briefs John Benson, Omaha District engineering division chief, during a functional flow test of the Garrison Dam spillway. The test measured water depth and velocity to calculate total spillway flow, providing valuable data to help ensure the spillway’s long-term performance and reliability. The operation also tested the spillway’s tainter gates to confirm they are ready to perform their critical flood-control role during future high-water events. (U.S. Army Corps of Engineers photo by Delanie Stafford)

    IMAGE INFO

    Date Taken: 06.24.2026
    Date Posted: 07.09.2026 11:02
    Photo ID: 9801340
    VIRIN: 260624-A-KS317-1018
    Resolution: 6334x4187
    Size: 6.02 MB
    Location: US

    Web Views: 18
    Downloads: 2

    PUBLIC DOMAIN