(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    Light Capacity Fleet Supports Critical Repairs at Cannelton Lock and Dam [Image 10 of 23]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A worker wearing a hard hat and green uniform is securing or attaching a wire rope sling to a heavy black cylindrical pipe or equipment component. The close-up perspective emphasizes the rigging hardware including shackles, hooks, and braided wire cable. The setting appears to be an industrial or construction site with heavy equipment visible in the background.

    Light Capacity Fleet Supports Critical Repairs at Cannelton Lock and Dam replacing emergency gates.

    IMAGE INFO

    Date Taken: 05.27.2026
    Date Posted: 07.09.2026 08:33
    Photo ID: 9801006
    VIRIN: 260527-A-KL057-1965
    Resolution: 6000x4000
    Size: 4.97 MB
    Location: US

    Web Views: 10
    Downloads: 2

    PUBLIC DOMAIN