Defense Logistics Agency (DLA) Chief Branch Manager Rolietta Massingill-Johnson, Norfolk Naval Shipyard (NNSY) Project Material Manager Kim Brashears, and DLA Distribution Process Specialist Amanda Lunceford verify material for USS California (SSN 781). This seamless partnership between NNSY's Code 520 and the DLA team in Code 550 ensures that all parts are properly received, inducted, and tracked within the shipyard's supply system.
| Date Taken: | 05.27.2026 |
| Date Posted: | 07.02.2026 08:27 |
| Photo ID: | 9788107 |
| VIRIN: | 260527-N-UC087-6022 |
| Resolution: | 6720x4480 |
| Size: | 5.31 MB |
| Location: | PORTSMOUTH, VIRGINIA, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Access Code: Material Sourcing and Project Management Division (Code 520) [Image 5 of 5], by PO1 Christian Victor Bautista, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.