Retired Capt. Jeremy Vaughan, former Naval Air Weapons Station China Lake commanding officer, speaks during a ribbon cutting ceremony marking the completion of renovations on the combined NAWS China Lake/Naval Air Warfare Center Weapons Division headquarters building on June 23, 2026. The project is the last in a $4 billion dollar recovery effort after two major earthquakes struck the area in July 2019. (U.S. Navy photo by Ryan Smith)
| Date Taken: | 06.23.2026 |
| Date Posted: | 06.26.2026 17:28 |
| Photo ID: | 9776538 |
| VIRIN: | 260623-N-QK571-3201 |
| Resolution: | 2400x3600 |
| Size: | 2.28 MB |
| Location: | US |
| Web Views: | 6 |
| Downloads: | 0 |
This work, Finished the work: China Lake cuts the ribbon on final recovery project [Image 5 of 5], by Ryan Smith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.