A heated connector tunnel go between buildings to ensure the load, assemble, pack process is safely and securely conducted at Iowa Army Ammunition Plant. (U.S. Army photo by Shawn Eldridge, U.S. Army Sustainment Command)
| Date Taken: | 05.14.2024 |
| Date Posted: | 06.17.2026 17:20 |
| Photo ID: | 9757694 |
| VIRIN: | 240514-O-YZ466-8663 |
| Resolution: | 6240x4160 |
| Size: | 3.94 MB |
| Location: | US |
| Web Views: | 16 |
| Downloads: | 2 |
This work, A heated connector tunnel go between buildings to ensure the load, assemble, pack process is safely and securely conducted at Iowa Army Ammunition Plant. [Image 20 of 20], by Dori Whipple, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.