(e.g. yourname@email.com)

Forgot Password?

    Digital Visual Information Distribution System Logo

    A heated connector tunnel go between buildings to ensure the load, assemble, pack process is safely and securely conducted at Iowa Army Ammunition Plant. [Image 17 of 20]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    A heated connector tunnel go between buildings to ensure the load, assemble, pack process is safely and securely conducted at Iowa Army Ammunition Plant.

    UNITED STATES

    05.14.2024

    Photo by Dori Whipple 

    Iowa Army Ammunition Plant

    A heated connector tunnel go between buildings to ensure the load, assemble, pack process is safely and securely conducted at Iowa Army Ammunition Plant. (U.S. Army photo by Shawn Eldridge, U.S. Army Sustainment Command)

    IMAGE INFO

    Date Taken: 05.14.2024
    Date Posted: 06.17.2026 17:20
    Photo ID: 9757694
    VIRIN: 240514-O-YZ466-8663
    Resolution: 6240x4160
    Size: 3.94 MB
    Location: US

    Web Views: 16
    Downloads: 2

    PUBLIC DOMAIN