Royal Norwegian air force Master Sgt. Stain Uglestad, forward operating location crew chief, connects electrical power to a U.S. Air Force KC-135 Stratotanker, assigned to the 100th Air Refueling Wing, during Ramstein Flag 26 at Ørland Air Base, Norway, June 9, 2026. Norwegian support personnel work alongside U.S. Airmen to sustain KC-135 operations during the NATO Allied Air Command-led exercise. (U.S. Air Force photo by Senior Airman Aidan Martínez Rosiere)
| Date Taken: | 06.09.2026 |
| Date Posted: | 06.10.2026 13:18 |
| Photo ID: | 9740312 |
| VIRIN: | 260609-F-IH537-1101 |
| Resolution: | 4070x2711 |
| Size: | 1.55 MB |
| Location: | BREKSTAD, NO |
| Web Views: | 3 |
| Downloads: | 0 |
This work, 100 ARW finishes a days mission [Image 8 of 8], by SrA Aidan Martinez Rosiere, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.