(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    USACE river infrastructure paves the way for ODOT’s Brent Spence Bridge project [Image 1 of 7]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    USACE river infrastructure paves the way for ODOT’s Brent Spence Bridge project

    MOUNT VERNON, INDIANA, UNITED STATES

    05.30.2026

    Courtesy Photo

    U.S. Army Corps of Engineers, Louisville District

    The M/V Elizabeth Ann locks through John T. Myers Locks and Dam with a heavy crane bound from St. Louis to Cincinnati, May 30, 2026 in Mount Vernon, Indiana. The Ohio Department of Transportation worked with USACE to provide imagery of the trip for an ODOT "barge watch" public engagement campaign. (courtesy photo)

    IMAGE INFO

    Date Taken: 05.30.2026
    Date Posted: 06.10.2026 09:51
    Photo ID: 9739383
    VIRIN: 260530-A-A1409-8335
    Resolution: 4284x5712
    Size: 4.57 MB
    Location: MOUNT VERNON, INDIANA, US

    Web Views: 4
    Downloads: 1

    PUBLIC DOMAIN