Team members on the Rough River Dam Safety Modification project recently took part in a Rock Blasting Quality Assurance for Construction Personnel training to learn more about blasting operations on construction projects. The training, held May 18-22 in Louisville, Kentucky, provided an orientation to USACE Louisville District construction personnel on how to perform essential checks on the plans and field work during blasting operations.
| Date Taken: | 05.18.2026 |
| Date Posted: | 06.08.2026 09:50 |
| Photo ID: | 9733634 |
| VIRIN: | 260518-A-GI410-9993 |
| Resolution: | 3000x2000 |
| Size: | 1.74 MB |
| Location: | LOUISVILLE, KENTUCKY, US |
| Web Views: | 6 |
| Downloads: | 0 |
This work, Safety First: Rough River project team prioritizes safety ahead of blasting operations [Image 2 of 2], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.