KITTERY, Maine (June 03, 2026) — Byan Polanski a shipwright at Portsmouth Naval Shipyard installs scaffolding around a submarine in dry dock. As America’s leader in attack submarine maintenance, repair, and modernization, Portsmouth Naval Shipyard delivers the decisive edge required to master an era of evolving threats. It stands at the forefront of America's commitment to peace through strength, delivering combat-ready submarines that are lethal, resilient, and prepared to win. (U.S. Navy photo by Neil Boorjian)
| Date Taken: | 06.03.2026 |
| Date Posted: | 06.05.2026 11:36 |
| Photo ID: | 9727815 |
| VIRIN: | 260603-N-FQ573-1011 |
| Resolution: | 4251x2834 |
| Size: | 2.59 MB |
| Location: | KITTERY, MAINE, US |
| Web Views: | 13 |
| Downloads: | 2 |
This work, PNSY Shipwrights Assemble Scaffolding for USS New Mexico [Image 6 of 6], by Neil Boorjian, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.