The infrastructure modernization group discusses how to design an operational technology network architecture that captures utility meter data in real time during the second IRMA Working Group at Fort Huachuca, Arizona.
| Date Taken: | 05.18.2026 |
| Date Posted: | 06.02.2026 08:21 |
| Photo ID: | 9719504 |
| VIRIN: | 260519-O-DL913-8149 |
| Resolution: | 4285x3213 |
| Size: | 4.42 MB |
| Location: | FORT HUACHUCA, ARIZONA, US |
| Web Views: | 1 |
| Downloads: | 0 |
This work, Installation Resiliency and Mission Assurance Working Group [Image 3 of 3], by Sandra Rosario, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.