The U.S. Army Corps of Engineers, Buffalo District is working on repairs to the west breakwater of Lorain Harbor, Lorain, Ohio, May 28, 2026. Underlayer stone is placed at precise locations to build up the base of the breakwater where larger armor stone will be added to help prevent larger waves from entering the harbor. (U.S. Army photo by Andre' M. Hampton)
| Date Taken: | 05.28.2026 |
| Date Posted: | 05.29.2026 18:44 |
| Photo ID: | 9716014 |
| VIRIN: | 260528-A-VR700-1012 |
| Resolution: | 6240x4160 |
| Size: | 7.61 MB |
| Location: | LORAIN, OHIO, US |
| Web Views: | 0 |
| Downloads: | 0 |
This work, Repairing Lorain West Breakwater [Image 7 of 7], by Andre Hampton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.