View of the power distribution system nearing completion at Dworshak National Fish Hatchery, addressing aging infrastructure and enhancing safety and operational reliability. The main differences being the demolition and removal of the large tanks or biofilters which are seen in the before photo.
Photo courtesy of: Brooks Prather, Electrical Engineer, USACE Walla Walla District
| Date Taken: | 05.14.2026 |
| Date Posted: | 05.27.2026 17:00 |
| Photo ID: | 9710958 |
| VIRIN: | 260514-A-GA333-9402 |
| Resolution: | 1860x934 |
| Size: | 553.77 KB |
| Location: | AHSAHKA, IDAHO, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, Electrical System Upgrades at Dworshak Hatchery Bolster Fish Survival [Image 4 of 4], by Elijah Wittum, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.