A USACE Chicago District electrofishing crew conducts sampling operations alongside a moored vessel on Lake Calumet during the 2026 Spring Seasonal Intensive Monitoring effort, May 2026.
| Date Taken: | 05.14.2026 |
| Date Posted: | 05.27.2026 10:37 |
| Photo ID: | 9709532 |
| VIRIN: | 260514-O-VJ355-8218 |
| Resolution: | 6000x4000 |
| Size: | 4.89 MB |
| Location: | ILLINOIS, US |
| Web Views: | 2 |
| Downloads: | 0 |
This work, Two crew members working bow near large vessel hull [Image 15 of 15], by Jacob Zdrojewski, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.