(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Coast Guard CUtter Reliance eturns to Pensacola following an 8-month dry dock maintenance availability [Image 1 of 19]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Coast Guard CUtter Reliance eturns to Pensacola following an 8-month dry dock maintenance availability

    NORFOLK, VIRGINIA, UNITED STATES

    08.25.2025

    Courtesy Photo

    U.S. Coast Guard Atlantic Area

    Lt. Grace Tarbrake, the port engineer for the Coast Guard Cutter Reliance (WMEC 615), directs a contractor as the cutter’s crew prepares for docking at Colonna’s Shipyard in Norfolk, Virginia, Aug. 25, 2025. The Reliance’s crew completed an eight-month dry-dock maintenance period to conduct critical structural work aboard the cutter. (U.S. Coast Guard photo by Lt. j.g. Sarah Kaleta)

    IMAGE INFO

    Date Taken: 08.25.2025
    Date Posted: 05.08.2026 15:11
    Photo ID: 9672750
    VIRIN: 250825-G-G0100-1001
    Resolution: 1080x1920
    Size: 533.66 KB
    Location: NORFOLK, VIRGINIA, US

    Web Views: 0
    Downloads: 0

    PUBLIC DOMAIN