Lt. Grace Tarbrake, the port engineer for the Coast Guard Cutter Reliance (WMEC 615), directs a contractor as the cutter’s crew prepares for docking at Colonna’s Shipyard in Norfolk, Virginia, Aug. 25, 2025. The Reliance’s crew completed an eight-month dry-dock maintenance period to conduct critical structural work aboard the cutter. (U.S. Coast Guard photo by Lt. j.g. Sarah Kaleta)