Contractors from Fort Benning’s Directorate of Public Works install an upright bayonet target frame at the installation's new Bayonet Assault Course Feb. 18, 2026. Operating on an aggressive timeline, crews rapidly built the structural obstacles necessary to deliver the site ahead of schedule and fully support the warfighter. (U.S. Army photo by Patrick A. Albright)
| Date Taken: | 02.18.2026 |
| Date Posted: | 05.11.2026 11:06 |
| Photo ID: | 9671980 |
| VIRIN: | 260218-A-YH902-2444 |
| Resolution: | 8005x5337 |
| Size: | 17.47 MB |
| Location: | US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, 2026 02 18 Bayonet Target Installation [Image 9 of 9], by Patrick Albright, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.