A crane lifts a section of a new Boingo cellular tower into place, April 1, 2026. The infrastructure project strengthens wireless connectivity to support mission readiness, daily coordination, and the needs of tens of thousands of personnel on the installation. (U.S. Army photo by Gloriann Martin)
| Date Taken: | 04.01.2026 |
| Date Posted: | 04.30.2026 08:45 |
| Photo ID: | 9635832 |
| VIRIN: | 260401-A-KH314-2710 |
| Resolution: | 4243x2829 |
| Size: | 7.85 MB |
| Location: | MARYLAND, US |
| Web Views: | 0 |
| Downloads: | 0 |
This work, Boingo Cell Tower Construction [Image 12 of 12], by Gloriann Martin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.