(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Spring arrives on the Upper Mississippi River as first tows reach St. Paul, MN [Image 4 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Spring arrives on the Upper Mississippi River as first tows reach St. Paul, MN

    HASTINGS, UNITED STATES

    03.23.2026

    Photo by Patrick Moes 

    U.S. Army Corps of Engineers, St. Paul District

    HASTINGS, Minn. – A deckhand aboard the Motor Vessel Crockett pulls rope during a lockage at Lock and Dam 2, in Hastings, Minnesota, March 23. The tow was the first to arrive amid the unofficial start of the 2026 navigation season.

    The average first tow arrives in St. Paul, Minnesota, around the third week in March. The Motor Vessel Neil N. Diehl was the first tow of the 2025 navigation season to reach St. Paul. She arrived March 20, 2025. The earliest date for a tow to reach St. Paul occurred March 4. It happened in 1983, 1984 and 2000.

    The St. Paul District maintains the Mississippi River 9-foot navigation channel and operates 12 locks and dams to support river traffic from the Twin Cities to Guttenberg, Iowa.

    IMAGE INFO

    Date Taken: 03.23.2026
    Date Posted: 03.24.2026 12:04
    Photo ID: 9581230
    VIRIN: 260324-A-LI073-1047
    Resolution: 6000x4000
    Size: 3.47 MB
    Location: HASTINGS, US

    Web Views: 7
    Downloads: 0

    PUBLIC DOMAIN