The new Onslow Beach Bridge moves into its closed position as contractors conduct final checks at Onslow Beach, Marine Corps Base Camp Lejeune, North Carolina, March 16, 2026. After four years of development, the new single-leaf bascule bridge, scheduled to open March 17, will replace the 72-year-old swing bridge that currently links MCB Camp Lejeune and Onslow Beach. This project highlights Marine Corps Installations East's commitment to modernizing its infrastructure and ensuring long-term operational readiness. (U.S. Marine Corps photo by Lance Cpl. Erica S. Padgett)
| Date Taken: | 03.16.2026 |
| Date Posted: | 03.16.2026 13:18 |
| Photo ID: | 9568563 |
| VIRIN: | 260316-M-KU714-1046 |
| Resolution: | 6210x4140 |
| Size: | 2.81 MB |
| Location: | MARINE CORPS BASE CAMP LEJEUNE, NORTH CAROLINA, US |
| Web Views: | 34 |
| Downloads: | 4 |
This work, New Onslow Beach Bridge Opening March 17 [Image 4 of 4], by LCpl Erica Padgett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.