U.S. Air Force Airmen assigned to the 554th Rapid Engineer Deployable Heavy Operational Repair Squadron Engineers and the 36th Civil Engineer Squadron use rakes to level material into a 50-foot crater at Northwest Field, Andersen Air Force Base, Guam, Nov. 13, 2025. The 554th RED HORSE filled the crater with the 36th CES as part of a training exercise to hone agile combat employment capabilities. (U.S. Air Force photo by Airman Kyle Jones)
| Date Taken: | 11.13.2025 |
| Date Posted: | 04.06.2026 20:17 |
| Photo ID: | 9458178 |
| VIRIN: | 251113-F-DM143-1386 |
| Resolution: | 6048x4024 |
| Size: | 3.22 MB |
| Location: | ANDERSEN AIR FORCE BASE, GU |
| Web Views: | 4 |
| Downloads: | 0 |
This work, Airmen engineers complete 50-foot crater repair [Image 7 of 7], by Amn Kyle Jones, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.