Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Runway construction is completed at Ellsworth Air Force Base [Image 5 of 6]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Runway construction is completed at Ellsworth Air Force Base

    ELLSWORTH AIR FORCE BASE, SOUTH DAKOTA, UNITED STATES

    11.26.2025

    Photo by Airman 1st Class Alec Carlberg 

    28th Bomb Wing

    The airfield lights are powered on and tested during the upgrading of the runway at Ellsworth Air Force Base, S.D., Nov. 26, 2025. The airfield renovation prepares the installation for B-21 Raider flight operations. (U.S. Air Force photo by Airman 1st Class Alec Carlberg)

    IMAGE INFO

    Date Taken: 11.26.2025
    Date Posted: 12.03.2025 16:11
    Photo ID: 9419783
    VIRIN: 251126-F-DW056-1322
    Resolution: 6973x4649
    Size: 1.25 MB
    Location: ELLSWORTH AIR FORCE BASE, SOUTH DAKOTA, US

    Web Views: 12
    Downloads: 3

    PUBLIC DOMAIN