A 3-D printed oyster reef made from dredged sediment from the Mobile Bay sits on an Oyster Farm on Mon Louis Beach in Dauphin Island, Alabama, Nov. 19, 2025. The U.S. Army Corps of Engineers, Mobile District, in partnership with ERDC and the MBNEP, developed the project to use dredged sediment from the bay beneficially. (U.S. Army photo by Chuck Walker)
| Date Taken: | 11.19.2025 |
| Date Posted: | 12.02.2025 15:04 |
| Photo ID: | 9417906 |
| VIRIN: | 251119-A-VP913-1001 |
| Resolution: | 6704x4232 |
| Size: | 3.48 MB |
| Location: | MOBILE, ALABAMA, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, District deploys 3-D printed oyster habitat from dredged material [Image 3 of 3], by Charles Walker, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.