U.S. Air Force Senior Airman Matthew Ross, 86th Aircraft Maintenance Squadron aerospace inspection journeyman, installs an exhaust nozzle and turbine section tail cone on a C-130J Super Hercules at Ramstein Air Base, Germany, Nov. 13, 2025. The nozzle installation was required to complete a routine inspection which ensures aircraft systems remain safe and mission-ready for global airlift operations. (U.S. Air Force photo by Airman 1st Class Rebecca Harima)
| Date Taken: | 11.11.2025 |
| Date Posted: | 11.18.2025 08:35 |
| Photo ID: | 9394193 |
| VIRIN: | 251113-F-YU145-1133 |
| Resolution: | 11999x7983 |
| Size: | 16.23 MB |
| Location: | RAMSTEIN AIR BASE, RHEINLAND-PFALZ, DE |
| Web Views: | 28 |
| Downloads: | 2 |
This work, Getting “Runway Ready” at Ramstein Air Base [Image 8 of 8], by A1C Rebecca Harima, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.