GREAT LAKES, Illinois (November 17, 2025) Dave Snow, Construction Manager, welcomes attendees during a ceremony for the Clearwell Repair and Replacement Groundbreaking held at the Naval Station Great Lakes water treatment plant. (U.S. Navy photo by Mass Communication Specialist 2nd Class Evan Mueller)
| Date Taken: | 11.17.2025 |
| Date Posted: | 11.20.2025 09:16 |
| Photo ID: | 9393162 |
| VIRIN: | 251117-N-YX844-1012 |
| Resolution: | 6525x4355 |
| Size: | 2.96 MB |
| Location: | GREAT LAKES, ILLINOIS, US |
| Web Views: | 3 |
| Downloads: | 0 |
This work, Naval Station Great Lakes Base Clearwell Repair and Replacement Project Groundbreaking [Image 6 of 6], by PO2 Evan Mueller, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.