Kaw Dam releases water into the spillway, June 7, 20217. The U.S. Army Corps of Engineers, Tulsa District is closing the bridge over Kaw Dam at noon, Nov. 7, 2025, due to advanced degradation of bearings that support the girders. The closure does not impact recreation or flood control operations.
| Date Taken: | 06.07.2017 |
| Date Posted: | 11.07.2025 12:49 |
| Photo ID: | 9381293 |
| VIRIN: | 170607-A-PO406-9267 |
| Resolution: | 5472x3264 |
| Size: | 3.33 MB |
| Location: | OKLAHOMA, US |
| Web Views: | 19 |
| Downloads: | 0 |
This work, Tulsa District to close bridge over Kaw Dam; flood operations, recreation not affected, by Preston Chasteen, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.