Before a large concrete pour, contractors on Marine Corps Base Camp Blaz test a sample of the batch to measure the mixture's integrity, workability, and consistency by conducting a 'slump test'.
| Date Taken: | 11.05.2025 |
| Date Posted: | 11.05.2025 19:30 |
| Photo ID: | 9379446 |
| VIRIN: | 251105-O-CM160-7327 |
| Resolution: | 6000x4000 |
| Size: | 5.46 MB |
| Location: | GU |
| Web Views: | 16 |
| Downloads: | 1 |
This work, Preparing for a Concrete Pour [Image 4 of 4], by Rachel Landers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.