Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Connecting Incirlik Air Base, one cable at a time [Image 9 of 10]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Connecting Incirlik Air Base, one cable at a time

    INCIRLIK AIR BASE, ADANA, TURKEY

    07.31.2025

    Photo by Senior Airman Greydon Furstenau 

    39th Air Base Wing

    Senior Airman Markeon Lee, 39th Communications Squadron cable and maintenance supervisor, operates a Ditch Witch trenching machine to support cable installation at Incirlik Air Base, Türkiye, July 31, 2025. Equipment like this allows the 39th CS to lay and maintain more than 300 miles of copper and fiber cabling across the installation, supporting Incirlik AB’s role as a strategic power projection platform for U.S. and NATO forces. (U.S. Air Force photo by Senior Airman Greydon Furstenau)

    IMAGE INFO

    Date Taken: 07.31.2025
    Date Posted: 08.06.2025 08:16
    Photo ID: 9241112
    VIRIN: 250731-F-XM554-1073
    Resolution: 8256x5504
    Size: 2.42 MB
    Location: INCIRLIK AIR BASE, ADANA, TR

    Web Views: 2
    Downloads: 1

    PUBLIC DOMAIN