Utilitiesman Constructionman Christopher Shoemaker ties rebar together at a gazebo construction project on White Beach Naval Port Facility. Shoemaker is assigned to Naval Mobile Construction Battalion (NMCB) 5, which is currently supporting Navy and joint forces throughout the U.S. Pacific Command (PACOM). (U.S. Navy photo by Mass Communication Specialist 1st Class John P. Curtis/Released)
Date Taken: | 04.30.2013 |
Date Posted: | 05.03.2013 07:26 |
Photo ID: | 921821 |
VIRIN: | 130501-N-SD120-002 |
Resolution: | 2100x1466 |
Size: | 1.34 MB |
Location: | OKINAWA, JP |
Web Views: | 31 |
Downloads: | 7 |
This work, Before a concrete placement [Image 3 of 3], by PO1 John Paul Curtis, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT