U.S. Air Force maintainers, assigned to the 421st Mission Generation Force Element, depart the flightline after conducting preflight operations on an F-35A Lightning II during Cope Thunder 25-2 at Clark Air Base, Philippines, July 7, 2025. The exercise enhances interoperability between the U.S. Air Force and the Philippine Air Force and supported the Armed Forces of the Philippines' modernization efforts. (U.S. Air Force photo by Airman 1st Class Aden Brown)
| Date Taken: | 07.07.2025 |
| Date Posted: | 07.09.2025 19:29 |
| Photo ID: | 9170294 |
| VIRIN: | 250707-F-HW521-1397 |
| Resolution: | 6048x4024 |
| Size: | 2.06 MB |
| Location: | CLARK AIR BASE, PH |
| Web Views: | 240 |
| Downloads: | 24 |
This work, Cope Thunder 25-2: USAF F-35A Lightning II crew prepare for bilateral training [Image 8 of 8], by SrA Aden Brown, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.