Contractors step back to inspect the letter alignment at the Frank W. Mayborn Gate June 24, 2025, during signage updates tied to the post’s redesignation from Fort Cavazos back to Fort Hood, Texas. (U.S. Army photo by Eric Franklin, Fort Hood Public Affairs)
Date Taken: | 06.24.2025 |
Date Posted: | 06.24.2025 12:11 |
Photo ID: | 9129098 |
VIRIN: | 250624-A-VK434-2949 |
Resolution: | 4032x3024 |
Size: | 3.05 MB |
Location: | TEXAS, US |
Web Views: | 29 |
Downloads: | 4 |
This work, Contractors Inspect Completed Fort Hood Sign [Image 3 of 3], by Eric Franklin, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.