Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Securing the Runway: Heavy Equipment Operators Remove Bolts in Critical Overhaul [Image 3 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Securing the Runway: Heavy Equipment Operators Remove Bolts in Critical Overhaul

    (UNDISCLOSED LOCATION)

    06.03.2025

    Photo by Senior Airman Amanda Jett 

    United States Air Forces Central           

    A recently removed bolt lies on the ground after extraction within the U.S. Central Command area of responsibility, May 26, 2025. During the overhaul, operators drilled more than a foot deep into the concrete arresting system bed to remove over 30 bolts, ensuring the system could be safely disassembled and rebuilt. (U.S. Air Force photo by Senior Airman Amanda Jett)

    IMAGE INFO

    Date Taken: 06.03.2025
    Date Posted: 06.06.2025 08:04
    Photo ID: 9088795
    VIRIN: 250603-F-PU288-1090
    Resolution: 7621x5224
    Size: 5.87 MB
    Location: (UNDISCLOSED LOCATION)

    Web Views: 3
    Downloads: 1

    PUBLIC DOMAIN