A contractor ensures the rear elevator sections of a C-130 Hercules aircraft are properly fastened at Robins Air Force Base, Georgia, May 30, 2025. Though the C-130 was disassembled, rigged, and secured in accordance with the Department of the Air Force Instructions, he was tasked with ensuring his section of the payload was correct before accepting custody. (U.S. Air Force photo by Arthur Hylton)
Date Taken: | 05.30.2025 |
Date Posted: | 06.05.2025 15:06 |
Photo ID: | 9086850 |
VIRIN: | 250530-F-DM952-2806 |
Resolution: | 8448x6336 |
Size: | 14.05 MB |
Location: | ROBINS AIR FORCE BASE, GEORGIA, US |
Web Views: | 8 |
Downloads: | 2 |
This work, Robins AFB sends C-130 to Eglin AFB [Image 12 of 12], by Arthur Hylton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.