Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    P-8014U Wharf M1/M2 Shore Power Distribution project [Image 3 of 8]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    P-8014U Wharf M1/M2 Shore Power Distribution project

    JOINT BASE PEARL HARBOR-HICKAM, HAWAII, UNITED STATES

    04.21.2025

    Photo by Anna Marie G. Gonzales 

    Naval Facilities Engineering Systems Command Hawaii

    This shows the completion of the of the excavation work as part of the P-8014U Wharf M1/M2 Shore Power Distribution project to provide electrical infrastructure to power Mobile Utilities Support Equipment (MUSE) and supply shore power to future platforms such as the DDG 1000 Zumwalt Class Destroyers at General Berth Mike 1 on Joint Base Pearl Harbor-Hickam, Hawaii, April 21, 2025. The excavation work began in January 2025 and the project was completed ahead of schedule with a duration of 12-14 weeks. (U.S. Navy photo by Anna Marie G. Gonzales)

    IMAGE INFO

    Date Taken: 04.21.2025
    Date Posted: 05.20.2025 13:00
    Photo ID: 9048878
    VIRIN: 250421-N-XM133-1019
    Resolution: 8192x5464
    Size: 2.68 MB
    Location: JOINT BASE PEARL HARBOR-HICKAM, HAWAII, US

    Web Views: 23
    Downloads: 0

    PUBLIC DOMAIN