U.S. Airmen and civilians from the 355th Civil Engineer Squadron as well as Airmen from the Air Force Civil Engineer Maintenance Inspection and Repair Team and civilian contractors secure a new backup power generator to a 100-ton crane at Davis-Monthan Air Force Base, Arizona, May 13, 2025. The operation supports the installation of a modern 200-kilowatt unit that will reduce fuel consumption and maintenance requirements. (U.S. Air Force photo by Senior Airman Devlin Bishop)
Date Taken: | 05.13.2025 |
Date Posted: | 05.16.2025 16:38 |
Photo ID: | 9041862 |
VIRIN: | 250513-F-NC910-1115 |
Resolution: | 4875x3244 |
Size: | 988.47 KB |
Location: | DAVIS-MONTHAN AFB, ARIZONA, US |
Web Views: | 5 |
Downloads: | 0 |
This work, CE backup power generator replacement [Image 5 of 5], by SrA Devlin Bishop, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.