Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Portsmouth Naval Shipyard Officially Opens Gate 2 Bridge to Better Serve the Workforce [Image 1 of 2]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Portsmouth Naval Shipyard Officially Opens Gate 2 Bridge to Better Serve the Workforce

    KITTERY, MAINE, UNITED STATES

    05.14.2025

    Photo by Branden Bourque 

    Portsmouth Naval Shipyard

    Portsmouth Naval Shipyard, Kittery, Maine, May 14, 2025: A ribbon-cutting ceremony marks the official opening of the newly upgraded Gate 2 Bridge. The bridge upgrade involved replacing the failed coating system, repairing structural steel, and installing a new vehicle guardrail system. These enhancements improve regional infrastructure, ensuring smoother and safer transportation while supporting the shipyard's growing workforce. The project also includes a designated bike path and pedestrian walkway. The investment in the bridge will improve traffic flow, material delivery, and installation resiliency for the shipyard. The Shipyard infrastructure Optimization Program is a comprehensive, long-term recapitalization effort that delivers integrated investments in infrastructure and industrial plant equipment at the Navy's four public shipyards, expanding shipyard capacity and optimizing shipyard configuration to meet the Navy's fleet maintenance requirements. (U.S. Navy photo by Branden Bourque)

    IMAGE INFO

    Date Taken: 05.14.2025
    Date Posted: 05.15.2025 05:42
    Photo ID: 9037647
    VIRIN: 250514-N-VG694-1003
    Resolution: 4800x2700
    Size: 8.35 MB
    Location: KITTERY, MAINE, US

    Web Views: 7
    Downloads: 0

    PUBLIC DOMAIN