Two contractors secured in a lift apply primer to the side of a Bachelor Enlisted Quarters building in late April. The structures are over five feet tall and require scaffolding or aerial lifts to complete exterior work.
Date Taken: | 04.22.2025 |
Date Posted: | 05.11.2025 23:26 |
Photo ID: | 9028650 |
VIRIN: | 250423-O-CM160-6052 |
Resolution: | 6000x4000 |
Size: | 2.22 MB |
Location: | GU |
Web Views: | 5 |
Downloads: | 0 |
This work, Contractors Apply a Coat of Primer on a New BEQ Building on Camp Blaz. [Image 8 of 8], by Rachel Landers, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.