Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Melvin Price Locks and Dam Lift Gate Replacement [Image 9 of 11]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Melvin Price Locks and Dam Lift Gate Replacement

    ST. LOUIS, MISSOURI, UNITED STATES

    03.20.2025

    Photo by Janet Meredith 

    U.S. Army Corps of Engineers, St. Louis District - MVS

    St. Louis District Structural Engineer Kyle Anderson, Lock and Dam Equipment Mechanics, Logan Ruehrup directed by Lock and Dam Equipment Mechanic Zach Meszaros are lowered at Melvin Price Locks and Dam to inspect the slot intended for the second lift gate leaf. The Melvin Price Locks and Dam lift gate replacement project concludes the third phase in a multi-year maintenance project.

    IMAGE INFO

    Date Taken: 03.20.2025
    Date Posted: 04.15.2025 11:13
    Photo ID: 8974710
    VIRIN: 250320-A-KR238-1003
    Resolution: 6000x4000
    Size: 5.41 MB
    Location: ST. LOUIS, MISSOURI, US

    Web Views: 9
    Downloads: 2

    PUBLIC DOMAIN