St. Louis District Structural Engineer Kyle Anderson, Lock and Dam Equipment Mechanics, Logan Ruehrup directed by Lock and Dam Equipment Mechanic Zach Meszaros are lowered at Melvin Price Locks and Dam to inspect the slot intended for the second lift gate leaf. The Melvin Price Locks and Dam lift gate replacement project concludes the third phase in a multi-year maintenance project.
Date Taken: | 03.20.2025 |
Date Posted: | 04.15.2025 11:13 |
Photo ID: | 8974710 |
VIRIN: | 250320-A-KR238-1003 |
Resolution: | 6000x4000 |
Size: | 5.41 MB |
Location: | ST. LOUIS, MISSOURI, US |
Web Views: | 9 |
Downloads: | 2 |
This work, Melvin Price Locks and Dam Lift Gate Replacement [Image 11 of 11], by Janet Meredith, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.