Joseph Bailes, facilities operations specialist, lowers a ladder to the tunnel in preparation for the periodic inspection. USACE performs inspections of this tunnel on a 10-year cycle as part of the Periodic Inspection Program.
| Date Taken: | 03.11.2025 |
| Date Posted: | 03.18.2025 09:02 |
| Photo ID: | 8921734 |
| VIRIN: | 250312-A-ZL691-1004 |
| Resolution: | 4912x7360 |
| Size: | 27.58 MB |
| Location: | SUMMERSVILLE, WEST VIRGINIA, US |
| Web Views: | 16 |
| Downloads: | 1 |
This work, Tunnel Inspection at Summersville Dam [Image 7 of 7], by Josh Bennett, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.