Sections of the sheet piling at Barcelona Harbor where the USACE Buffalo District Floating Plant crew drilled and filled preliminary holes, Westfield, New York, Apr. 24, 2024. The drilling was used to determine a need for future grouting of the cells to fill any void space underneath and ensure the stabilization of the structure. (U.S. Army Photo by Andre' M. Hampton)
Date Taken: | 04.24.2024 |
Date Posted: | 05.03.2024 12:34 |
Photo ID: | 8379836 |
VIRIN: | 240424-A-VR700-2002 |
Resolution: | 2048x2048 |
Size: | 3.19 MB |
Location: | WESTFIELD, NEW YORK, US |
Web Views: | 10 |
Downloads: | 1 |
This work, Barcelona Harbor Drilling [Image 3 of 3], by Andre Hampton, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.