U.S. Army Corps of Engineers Transatlantic Middle East District advanced modeling manager Erick Stillman gives a presentation on the USACE TAM Advanced Modeling (AdM) Project Execution Plan (PxP) during a workshop in January, 2023. A PxP describes in formal terms how Advanced Modeling methods, techniques, and tools will be used in the development of our design products, as well as how we will use Advanced Modeling during construction. His presentation identified important influences, factors, and feedback where TAM reshaped vital segments of the USACE PxP into a more streamlined, efficient, and time-saving” document suitable for all types of Advanced Modeling design and construction projects, capable of a quick-turnaround to get projects started, while also maintaining established Advanced Modeling Standards for continued documentation of each specific project.
| Date Taken: | 01.15.2024 |
| Date Posted: | 04.03.2024 12:28 |
| Photo ID: | 8319302 |
| VIRIN: | 240115-A-A1417-1001 |
| Resolution: | 4032x3024 |
| Size: | 1.65 MB |
| Location: | WINCHESTER, US |
| Web Views: | 31 |
| Downloads: | 0 |
This work, Erick Stillman gives a presentation on the USACE TAM Advanced Modeling (AdM) Project Execution Plan (PxP) during a workshop in January, 2023 [Image 2 of 2], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.