Airmen from the 513th Expeditionary Rapid Engineer Deployable Heavy Operations Repair Squadron Engineer, pour and spread concrete mixture within the perimeter of the elevation at the Pacific Regional Training Center-Andersen, Guam, Mar. 13, 2024. The 513th ERHS has a diverse team of eight AFSCs and 32 personnel working on the project since the first full rotation arrived on Oct 23. (U.S. Air Force photo by Senior Airman Akeem K. Campbell)
| Date Taken: | 03.13.2024 |
| Date Posted: | 04.29.2024 15:08 |
| Photo ID: | 8316914 |
| VIRIN: | 240313-F-RA633-1058 |
| Resolution: | 6048x4024 |
| Size: | 10.47 MB |
| Location: | YIGO, GU |
| Web Views: | 70 |
| Downloads: | 0 |
This work, 513th ERHS constructs K-Spans for PACAF [Image 6 of 6], by SrA Akeem Campbell, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.