The U.S. Army Corps of Engineers and its contractor are repairing a non-federal flood risk management project in Stroudsburg, Pennsylvania. Part of the repairs involve clearing accumulated debris that was blocking a sanitary drain line from the borough (Photo by Ed Voigt)”
| Date Taken: | 03.10.2024 |
| Date Posted: | 03.25.2024 08:55 |
| Photo ID: | 8305699 |
| VIRIN: | 240311-O-XP172-4577 |
| Resolution: | 4896x3672 |
| Size: | 1.54 MB |
| Location: | STROUDSBURG, PENNSYLVANIA, US |
| Web Views: | 15 |
| Downloads: | 3 |
This work, Stroudsburg Flood Risk Management Project [Image 6 of 6], by Ed Voigt, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.