A U.S. Air Force F-35A Lightning II assigned to the 95th Fighter Squadron takes off at Tyndall Air Force Base, Florida, March 1, 2024. More than 70 F-35s are projected to join the 325th Fighter Wing’s fleet in the coming years with Tyndall continuing to transition into a fully combat-ready mission. (U.S. Air Force photo by Airman 1st Class Zeeshan Naeem)
| Date Taken: | 03.01.2024 |
| Date Posted: | 03.21.2024 10:46 |
| Photo ID: | 8300878 |
| VIRIN: | 240301-F-LY429-1974 |
| Resolution: | 3050x2020 |
| Size: | 1.46 MB |
| Location: | TYNDALL AIR FORCE BASE, FLORIDA, US |
| Web Views: | 156 |
| Downloads: | 25 |
This work, 95th Fighter Squadron and Fighter Generation Squadron complete first TDY [Image 12 of 12], by SrA Zeeshan Naeem, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.