Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    90 MMXS prepares for a maintenance op [Image 3 of 6]

    90 MMXS prepares for a maintenance op

    F.E. WARREN AIR FORCE BASE, WY, UNITED STATES

    02.06.2024

    Photo by Senior Airman Sarah Post 

    90th Missile Wing

    Senior Airman Cody Shipman, 90th Missile Maintenance Squadron Missile Maintenance Team member, prepares a hoist to load a missile guidance system into a payload transporter at the 90th Maintenance Group high bay on F.E. Warren Air Force Base, Wyoming, Feb. 6, 2024. MMT travels to launch facilities across the base’s missile complex to perform maintenance on the Minuteman III weapons system. (U.S. Air Force photo by Senior Airman Sarah Post)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 02.06.2024
    Date Posted: 02.26.2024 14:30
    Photo ID: 8255805
    VIRIN: 240206-F-SE585-1169
    Resolution: 5544x3689
    Size: 872.06 KB
    Location: F.E. WARREN AIR FORCE BASE, WY, US

    Web Views: 39
    Downloads: 2

    PUBLIC DOMAIN