Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Construction of the new MWR at the Installation of the Future is picking up speed [Image 3 of 5]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Construction of the new MWR at the Installation of the Future is picking up speed

    PANAMA CITY, FLORIDA, UNITED STATES

    10.27.2023

    Photo by christine walker 

    Air Force Installation and Mission Support Center

    Construction at is rapidly moving. The swimming pool walls have been formed and shotcrete is complete on Tyndall Air Force Base’s Moral Welfare and Recreation facility swimming pool. Crews are pouring sidewalk foundations and installing coping tile and electrical conduits for the pool lights. The $38.2 million Morale, Welfare and Recreation construction project is expected to be complete by May 2024. (USAF Photo by Christine Alombro Walker)

    IMAGE INFO

    Date Taken: 10.27.2023
    Date Posted: 01.03.2024 09:50
    Photo ID: 8182855
    VIRIN: 231228-F-QF062-7003
    Resolution: 6000x4000
    Size: 9.3 MB
    Location: PANAMA CITY, FLORIDA, US

    Web Views: 4
    Downloads: 2

    PUBLIC DOMAIN