Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    3-D printed concrete building at Installation of the Future reaches new construction milestone [Image 1 of 4]

    3-D printed concrete building at Installation of the Future reaches new construction milestone

    PANAMA CITY, FL, UNITED STATES

    11.29.2023

    Photo by christine walker 

    Air Force Installation and Mission Support Center

    The roof is in place and the construction of the 3-D printed concrete building at Tyndall Air Force Base nears completion. The roof secures the frame and trusses to the wavy, 3-D printed, concrete walls, enabling engineers to complete construction of the interior features of what will become a robotics research range building. (USAF Photo by Christine Alombro Walker)

    LEAVE A COMMENT

    IMAGE INFO

    Date Taken: 11.29.2023
    Date Posted: 01.03.2024 09:53
    Photo ID: 8182657
    VIRIN: 231228-F-QF062-5001
    Resolution: 2668x1706
    Size: 763.99 KB
    Location: PANAMA CITY, FL, US

    Web Views: 9
    Downloads: 2

    PUBLIC DOMAIN