U.S. Air Force Tech. Sgt. Paul Chitpanya, Team Lead, explains the work that was accomplished over the last three weeks to establish connectivity from the main distribution frame to the operations building at the 136th Airlift Wing. The team worked tirelessly to lay fiber optic cable underground, which completes Phase I of the mission. (U.S. Air Force photo by Tech. Sgt. Tia Hambrick) (This image was electronically cropped and ethically enhanced to emphasize the subject and does not misrepresent the subject or the original in any way.)
Date Taken: | 12.21.2023 |
Date Posted: | 12.21.2023 21:57 |
Photo ID: | 8178760 |
VIRIN: | 231221-F-LF690-1012 |
Resolution: | 3684x3534 |
Size: | 2.65 MB |
Location: | FORT WORTH, TX, US |
Web Views: | 49 |
Downloads: | 2 |
This work, Members from the 272nd Engineering Installation Squadron receive token of appreciation [Image 2 of 2], by TSgt Tia Hambrick, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.
LEAVE A COMMENT