One of the traditions of topping out ceremonies is for those involved in the structure's construction history to sign the final steel beam before its placement.
| Date Taken: | 11.30.2023 |
| Date Posted: | 12.04.2023 11:26 |
| Photo ID: | 8149813 |
| VIRIN: | 231130-A-GI410-5024 |
| Resolution: | 2526x2088 |
| Size: | 1.71 MB |
| Location: | LOUISVILLE, KENTUCKY, US |
| Web Views: | 33 |
| Downloads: | 3 |
This work, Louisville VA Medical Center reaches “Topping Out” milestone [Image 6 of 6], by Michael Maddox, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.