The stabilized cliffs after the completion of the Montauk Point Coastal Resiliency Project in 2023. Credit: USACE.
| Date Taken: | 11.01.2023 |
| Date Posted: | 11.02.2023 14:50 |
| Photo ID: | 8102213 |
| VIRIN: | 231101-D-CR197-1112 |
| Resolution: | 2400x1600 |
| Size: | 1.39 MB |
| Location: | MONTAUK POINT, NEW YORK, US |
| Web Views: | 73 |
| Downloads: | 3 |
This work, The stabilized cliffs after the completion of the Montauk Point Coastal Resiliency Project [Image 9 of 9], by Hector Mosley, identified by DVIDS, must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.