The 1,000-ton deckhouse of the future destroyer USS Zumwalt (DDG 1000) is craned toward the deck of the ship to be integrated with the ship's hull at General Dynamics Bath Iron Works. The ship launch and christening are planned in 2013. (U.S. Navy photo)
Date Taken: | 12.14.2012 |
Date Posted: | 12.19.2012 23:14 |
Photo ID: | 804548 |
VIRIN: | 121214-N-ZZ999-203 |
Resolution: | 5120x3413 |
Size: | 5.78 MB |
Location: | BATH, MAINE, US |
Web Views: | 630 |
Downloads: | 63 |
This work, Deckhouse lifted for USS Zumwalt [Image 4 of 4], must comply with the restrictions shown on https://www.dvidshub.net/about/copyright.