Maintenance window scheduled to begin at February 14th 2200 est. until 0400 est. February 15th

(e.g. yourname@email.com)

Forgot Password?

    Defense Visual Information Distribution Service Logo

    Palau Harbor Construction (NMCB-3) [Image 1 of 4]

    Issued by: on

    VIRIN:
    Date Created:
    City:
    State:
    Country:
    Palau Harbor Construction (NMCB-3)

    230817-N-IH581-1006 KOROR, Palau (Aug. 17, 2023) Construction Electrician 2nd Class Hendrix Weishampel, from Crosby, Texas, assigned to Naval Mobile Construction Battalion (NMCB) 3, drills holes for dowels to be placed, during Koror, Palau’s harbor project. NMCB-3 is forward deployed throughout the Indo-Pacific region and United States territories to support and maintain a free and open Indo-Pacific. As the stand-in, crisis response, naval engineering force, NMCB-3 maintains a ready posture to deliver in-theater expeditionary logistics via expeditionary shore infrastructure, forward damage repair, and mobile construction. (U.S. Navy photo by Utilitesman 3rd Class Jacob Ousley)

    IMAGE INFO

    Date Taken: 08.17.2023
    Date Posted: 09.17.2023 19:27
    Photo ID: 7994419
    VIRIN: 230817-N-IH571-1006
    Resolution: 3015x2580
    Size: 1.99 MB
    Location: KOROR, PW
    Hometown: CROSBY, TEXAS, US

    Web Views: 39
    Downloads: 3

    PUBLIC DOMAIN